Semiconductor Equipment Service


EXAMPLE PROJECTS

Project Date Scope of Work / Positions
Semiconductor IDM

Full Case Study
2005-2007 Tool Installation
  • Logistics
  • Loading
  • Uncrating
  • Rigging
  • Installation
Aerospace Manufacturer

Full Case Study
2007 - Ongoing Tool Service
  • Tool Sustaining Maintenance
  • Tool Repair
Semiconductor OEM
2002 - Ongoing Tool Support
  • New tool installation
  • Preventative Maintenance
  • Tool Upgrades
  • Start Up
  • Prequalification
  • Tool de-installation and removal
Semiconductor OEM
2002 - Ongoing Tool Support
  • New tool installation
  • Preventative Maintenance
  • Tool Upgrades
  • Start Up
  • Prequalification
  • Tool de-installation and removal
Semiconductor OEM
2002 - Ongoing
Semconductor OEM
2007 - Ongoing Tool Support
  • New tool installation
  • Preventative Maintenance
  • Tool Upgrades
  • Start Up
  • Prequalification
  • Tool de-installation and removal
Semiconductor IDM
2007 - Ongoing Tool Removal and Reinstallation
Semiconductor OEM
2007 - Ongoing